Approval of Equipment and Installations (Design Certification Testing)
    Trailerbild

    Search


    Contact

    Dr. Winfried Sindern
    Phone: +49 234 957157-51
    Fax: +49 234 957157-50
    E-mail: isdmt.de

    Approval of Equipment and Installations (Design Certification Testing)

    If complex systems and components that have to satisfy high levels of safety are to be installed in shaft hoisting systems then it is essential to perform in advance extensive tests on a prototype. This applies especially to the use of programmable electronic systems, which prior to being put into operation must be subjected to an analysis of the safety concept as well as intensive hardware and software tests.

    In accordance with Article 5 of the Mining Regulations for Shaft and Inclined Haulage Equipment (BVOS) we can carry out for you extensive pretesting of the design type on hardware and software for ’installations subject to approval’, for example on:

    • Speed controllers
    • Speed monitoring equipment
    • Brake systems
    • and other safety relevant components and installations